tel.+48 505 698 826      wycena@skb.net.pl

Implementation

Civil constructions

Railway stations of the Poprad Valley

During this implementation, we paid special attention to preserving the historical character of the station. The works included locations under conservation protection, where historic elements and decorations typical of the region were recreated. As part of the reconstruction and construction of railway stations, we built new installations and infrastructure, such as water supply, sewage, heating, air conditioning, ventilation, electrical, low-voltage and telecommunications systems. We added small architecture elements such as shelters, benches, waste bins and bicycle repair stations. We have adapted the facilities to the needs of people with limited mobility and removed architectural barriers. As a contractor, we paid due attention to the historical nature of the buildings, preserving the original elements, and also used a BMS system enabling remote control of the buildings.

  • Investor: Polish State Railways S.A. (PKP S.A.)
  • Date: 2023
  • Location: Milik, Żegiestów-Zdrój, Żegiestów, Zubrzyk, Wierchomla Wielka, Łomica-Zdrój, Piwniczna, Piwniczna-Zdrój, Młodów, Rytro, Barcice and Stary Sącz
  • Investment value: PLN 60 million