tel.+48 505 698 826      wycena@skb.net.pl

Implementation

Civil constructions

Karol Jonscher Hospital in Łódź

  • Investor: Karol Jonscher Hospital in Łódź
  • Date: 06/2014 – 10/2016
  • Location: Łódź

For the Karol Jonscher hospital, we carried out the reconstruction of the rooms along with changing their purpose to hospital administration rooms and the construction of an additional water supply source.
We have outfitted the facility with specialized equipment. The purchased medical equipment included: an anesthetic and surgical system, ceiling power units, operating tables, and surgical lamps.
We have built a new pavilion with an area of over 2,600 m2, connected to other hospital facilities, where an integrated IT system operates, and entrance to individual departments and operating blocks is regulated by an electronic access system.
The operating block consists of five air-conditioned operating rooms made using glass panel technology and lit with LEDs. The block is also equipped with a modern integrated operating room system, enabling internal data exchange, connected to the imaging diagnostic system currently already functioning in the hospital. All this increases the number of procedures performed and improves the quality of patient treatment. Operating rooms are prepared to perform many procedures in the field of general surgery, traumatic and orthopedic surgery and ophthalmology. Replacing equipment in a large part of the renovated hospital is of great importance, especially for patients coming to the Emergency Department. Professional conditions were created there to provide quick and specialized assistance.